Earth work in foundation trenches up to 1.5 m depth and maximum 10 m lead including protecting and maintaining the trench: Soft claye soil/ loose sand / silt
Earth work in foundation trenches up to 1.5 m depth and maximum 10 m lead including protecting and maintaining the trench: Soft claye soil/ loose sand / silt
Materials for
1
cft
| Material | Qty | Unit | Unit Price | Amount |
|---|---|---|---|---|
| Skill Labour (civil) | 1 | person | 550.00 | 550.00 |
| Ordinary Labour | 5 | person | 550.00 | 2,750.00 |
| Miscellaneous (taka) | 300 | LS | 1.00 | 300.00 |
| Grand Total | 3,600.00 | |||