Add VAT with adjustment

factor

 

Overhead

1.06383

3.50%

=

Tk.

179.42

Total

6.00%

=

=

Tk. Tk.

5,818.35

371.38

Grand Total Rate per sft Rate per sqm

=

=

=

Tk.
Tk.
Tk.

6,189.73

275.10

2,961.18

 

 

Say,

Tk.

2,961 .00 per sqm

 

 

 

 

 

 

 

 

 

 

 

 

Item No.- 14.13.3

 

 

 

 

 

 

 

 

Supplying, fitting, fixing of Aluminium sliding fly proof Netting

 

 

 

 

 

 

 

 

Considering : 1X4'-6"X 5'-0" = 22.50 sft

(a) Cost of materials

  1. 38mm x 38mm Aluminium frame (Wall box) of 1.5 mm

Horizontal 2 x 4'-6"= 9.00

Vertical 2 x 5'-0"= 10.00

rft
rft

 

 

 

 

 

 

 

= 19.00

Add wastage 3%= 0.57

rft
rft

 

= 19.570

rft

@

Tk.

72.00

per rft

=

Tk.

1,409.04

  1. 38mm x 12mm and 1.5 mm thick Aluminium frame of Netting shutter top,

Horizontal 2 x 2 x 2'-3"= 9.00 rft

Vertical 2 x 2 x 5'-0"= 20.00 rft

 

 

 

 

 

 

= 29.00

Add wastage 3%= 0.87

rft
rft

 

= 29.870

  1. Mosquito Net (plastic)

1 x 5'-0" x 4'-6"= 22.50

Add wastage 3%= 0.68

rft

sft
sft

@

Tk.

65.00

per rft

=

Tk.

1,941.55

= 23.180

sft

@

Tk.

15.00

per sft

=

Tk.

347.70

  1. Wheel 8

nos

@

Tk.

70.00

each

=

Tk.

560.00

  1. Sealant 50

rft

@

Tk.

3.00

per gm

=

Tk.

150.00

  1. Rubber 1x 2x 14'-0" 28.00

rft

@

Tk.

1.90

per rft

=

Tk.

53.20

v) Bolts & screws etc.

b) Fitting and fixing of accessories

  1. Skilled Technician 1/4

no

@

Tk.

1,000.00

LS
each

=

=

Tk. Tk.

40.00

250.00

  1. Semi skilled technician 1/4

no

@

Tk.

600.00

each

=

Tk.

150.00

  1. Tools, plants and sundrise etc.

 

 

 

 

LS

=

Tk.

60.00

 

 

 

 

 

Sub - Total

=

Tk.

4,961.49

 

 

 

 

Profit

10.00%

=

Tk.

496.15

 

 

 

 

Overhead

3.50%

=

Tk.

173.65

 

 

 

 

 

Total

=

Tk.

5,631.29

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

359.44

 

 

 

 

 

Grand Total

=

Tk.

5,990.73

 

 

 

 

 

Rate per sft

=

Tk.

266.25

 

 

 

 

 

Rate per sqm

=

Tk.

2,865.92

 

 

Say,

Tk.

2,866 .00 per sqm

 

 

 

 

 

 

 

 

 

 

 

 

Item No.- 14.13.4

 

 

 

 

 

 

 

 

Supplying, fitting, fixing of Aluminium sliding fly proof Netting

 

 

 

 

 

 

 

 

Considering : 1X4'-6"X 5'-0" = 22.50 sft

(a) Cost of materials

  1. 38mm x 38mm Aluminium frame (Wall box) of 1.5 mm

Horizontal 2 x 4'-6"= 9.00

Vertical 2 x 5'-0"= 10.00

rft
rft

 

 

 

 

 

 

 

= 19.00

Add wastage 3%= 0.57

rft
rft

 

= 19.570

rft

@

Tk.

80.00

per rft

=

Tk.

1,565.60

  1. 38mm x 12mm and 1.5 mm thick Aluminium frame of Netting shutter top,

Horizontal 2 x 2 x 2'-3"= 9.00 rft

Vertical 2 x 2 x 5'-0"= 20.00 rft

 

 

 

 

 

 

= 29.00

rft