26.2.3

Special coloured low -down (Bangladeshi), size 490 x 190 x 350 mm, wt.: 14 kg or equivalent Considering 1 No. of fixture

 

 

 

 

1.

Special coloured low-down 1 no @ Tk. 1,600.00 each

=

Tk.

1,600.00

2.

Accessories:

 

 

 

(a)

32 mm dia plastic pipe 1 no @ Tk. 75.00 each

=

Tk.

75.00

3.

Fitting fixing materials:

 

 

 

(a)

Clamp 2 nos @ Tk. 50.00 each

=

Tk.

100.00

  1.  

50 mm rowel plug with screws 4 nos @ Tk. 9.00 each

=

Tk.

36.00

  1.  

75 mm screw, rowel plug 3 nos @ Tk. 13.00 each

=

Tk.

39.00

4.

Labour:

 

 

 

  1.  

Plumber 0.25 no @ Tk. 600.00 each

=

Tk.

150.00

  1.  

Skilled labour 0.5 no @ Tk. 390.00 each

=

Tk.

195.00

 

Sub - Total

=

Tk.

2,195.00

 

Profit 10.00%

=

Tk.

219.50

 

Overhead 3.50%

=

Tk.

76.83

 

Total

=

Tk.

2,491.33

 

Add VAT with adjustment factor 1.06383 6.00%

=

Tk.

159.02

 

Grand Total

=

Tk.

2,650.35

 

Rate per No.

=

Tk.

2,650.35

 

Say, Tk. 2,650 .00 each

 

 

 

 

 

 

 

 

Item No.- 26.3 Supplying, fitting and fixing European type glazed porcelain Combi closet

 

 

 

26.3.1

Supplying, fitting and fixing European type glazed porcelain Combi closet, in/c plastic seat cover, cistern system

 

 

26.3.1.1

Light colour (Ivory/ Alpine White/ Grey/ Pink/ Blue/ Aqua Verde) 670 x 365 x 755 mm, 31.0 kg or equivalent

 

 

 

Considering 1 No. of fixture

 

 

1.

White Combicloset 1 no @ Tk. 6,040.00 each

=

Tk.

6,040.00

2

Fitting fixing materials:

 

 

 

(a)

Cement mortar (1:4)

 

 

 

  1.  

Cement 0.1 bag @ Tk. 395.00 per bag

=

Tk.

39.50

  1.  

Sand (F.M. 1.2) 0.5 cft @ Tk. 1,400.00 per % cft

=

Tk.

7.00

(b)

Nuts with washer 4 nos @ Tk. 26.00 each

=

Tk.

104.00

4.

Labour:

 

 

 

  1.  

Plumber 0.25 no @ Tk. 600.00 each

=

Tk.

150.00

  1.  

Skilled labour 1 no @ Tk. 390.00 each

=

Tk.

390.00

  1.  

Ordinary labour 0.5 no @ Tk. 320.00 each

=

Tk.

160.00

 

Sub - Total

=

Tk.

6,890.50

 

Profit 10.00%

=

Tk.

689.05

 

Overhead 3.50%

=

Tk.

241.17

 

Total

=

Tk.

7,820.72

 

Add VAT with adjustment factor 1.06383 6.00%

=

Tk.

499.19

 

Grand Total

=

Tk.

8,319.91

 

Rate per No.

=

Tk.

8,319.91

 

Say, Tk. 8,320 .00 each

 

 

 

26.3.1.2

Coloured combicloset Coloured (Marble Shade), 670 x 365 x 755 mm,31.0 kg or equivalent

 

 

 

 

Considering 1 No. of fixture

 

 

 

1.

Coloured combicloset: 1 no @ Tk. 7,850.00 each

=

Tk.

7,850.00

2

Fitting fixing materials:

 

 

 

(a)

Cement mortar (1:4)

 

 

 

  1.  

Cement 0.1 bag @ Tk. 395.00 per bag

=

Tk.

39.50

  1.  

Sand (F.M. 1.2) 0.5 cft @ Tk. 1,400.00 per % cft

=

Tk.

7.00

(b)

Nuts with washer 4 nos @ Tk. 26.00 each

=

Tk.

104.00

4.

Labour:

 

 

 

  1.  

Plumber 0.25 no @ Tk. 600.00 each

=

Tk.

150.00

  1.  

Skilled labour 1 no @ Tk. 390.00 each

=

Tk.

390.00

  1.  

Ordinary labour 0.5 no @ Tk. 320.00 each

=

Tk.

160.00

 

Sub - Total

=

Tk.

8,700.50

 

Profit 10.00%

=

Tk.

870.05

 

Overhead 3.50%

=

Tk.

304.52