Add VAT with adjustment

factor

 

Overhead

1.06383

3.50%

=

Tk.

4.73

Total

6.00%

=

=

Tk. Tk.

153.27

9.78

Grand Total Rate per rm

=

=

Tk. Tk.

163.05

163.05

Say,

Tk.

163

.00 per meter

 

 

 

 

 

 

 

 

 

 

Item No.- 27.11.2.2

 

 

 

 

 

 

 

 

Supplying 50 mm dia (Class D) uPVC tube well pipe and blank pipe

 

 

 

 

 

 

 

 

Considering 1 meter

  1. 50 mm dia (Class D) PVC pipe 1

meter

@

Tk.

137.76

per meter

=

Tk.

137.76

  1. Carriage of materials

 

 

 

 

LS

=

Tk.

21.33

 

 

 

 

 

Sub - Total

=

Tk.

159.09

 

 

 

 

Profit

10.00%

=

Tk.

15.91

 

 

 

 

Overhead

3.50%

=

Tk.

5.57

 

 

 

 

 

Total

=

Tk.

180.57

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

11.53

 

 

 

 

 

Grand Total

=

Tk.

192.10

 

 

 

 

 

Rate per rm

=

Tk.

192.10

 

 

Say,

Tk.

192

.00 per meter

 

 

 

 

 

 

 

 

 

 

 

 

Item No.- 27.11.2.3

 

 

 

 

 

 

 

 

Supplying 50 mm dia (Class E) uPVC tube well pipe and blank pipe

 

 

 

 

 

 

 

 

Considering 1 meter

  1. 50 mm dia (Class E) PVC pipe 1

meter

@

Tk.

190.24

per meter

=

Tk.

190.24

  1. Carriage of materials

 

 

 

 

LS

=

Tk.

21.33

 

 

 

 

 

Sub - Total

=

Tk.

211.57

 

 

 

 

Profit

10.00%

=

Tk.

21.16

 

 

 

 

Overhead

3.50%

=

Tk.

7.40

 

 

 

 

 

Total

=

Tk.

240.13

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

15.33

 

 

 

 

 

Grand Total

=

Tk.

255.46

 

 

 

 

 

Rate per rm

=

Tk.

255.46

 

 

Say,

Tk.

255

.00 per meter

 

 

 

 

 

 

 

 

 

 

 

 

Item No.- 27.11.3.1

 

 

 

 

 

 

 

 

Supplying 50 mm dia(Class C) uPVC Strainer

 

 

 

 

 

 

 

 

Considering 1 meter

  1. 50 mm dia (Class C) PVC pipe 1
  2. Making slot

and cleaning 1

meter meter

@

@

Tk. Tk.

113.71

38.40

per meter
per meter

=

=

Tk. Tk.

113.71

38.40

  1. Carriage of materials

 

 

 

 

LS

=

Tk.

25.60

 

 

 

 

 

Sub - Total

=

Tk.

177.71

 

 

 

 

Profit

10.00%

=

Tk.

17.77

 

 

 

 

Overhead

3.50%

=

Tk.

6.22

 

 

 

 

 

Total

=

Tk.

201.70

Add VAT with adjustment factor

 

1.06383

6.00%

=

Tk.

12.87

 

 

 

 

 

Grand Total

=

Tk.

214.57

 

 

 

 

 

Rate per rm

=

Tk.

214.57

 

 

Say,

Tk.

215

.00 per meter

 

 

 

 

 

 

 

 

 

 

 

 

Item No.- 27.11.3.2

 

 

 

 

 

 

 

 

Supplying 50 mm dia(Class D) uPVC Strainer

 

 

 

 

 

 

 

 

Considering 1 meter

  1. 50 mm dia (Class D) PVC pipe 1
  2. Making slot

and cleaning 1

meter meter

@

@

Tk. Tk.

137.76

38.40

per meter
per meter

=

=

Tk. Tk.

137.76

38.40

  1. Carriage of materials

 

 

 

 

LS

=

Tk.

25.60