Item No.- 28.5.2

 

 

 

 

 

Supplying different sizes Valve Tee, Service Tee: 50 x 50 x 25 mm N.D.Tee CD 40 Considering 1 No. Tee

 

 

 

 

 

  1. Tee (as per Titas Gas rate)

 

 

=

Tk.

258.30

  1. Carrying, welding & fitting-fixing

 

LS

=

Tk.

2,240.00

 

 

Sub - Total

=

Tk.

2,498.30

 

Incidental charges

10.00%

=

Tk.

249.83

 

Profit

10.00%

=

Tk.

249.83

 

Overhead

3.50%

=

Tk.

8.74

 

 

Total

=

Tk.

3,006.70

Add VAT with adjustment factor

1.06383

6.00%

=

Tk.

191.92

 

 

Grand Total

=

Tk.

3,198.62

Say,

Tk. 3,199 .00 each

 

 

 

 

 

 

 

 

 

Item No.- 28.5.3

 

 

 

 

 

Supplying different sizes Valve Tee, Service Tee: 25 x 25 x 25 mm Service Tee CD 40

 

 

 

 

 

Considering 1 No. Tee

  1. Service Tee (as per Titas Gas rate)

 

 

=

Tk.

1,728.83

  1. Carrying, welding & fitting-fixing

 

LS

=

Tk.

1,600.00

 

 

Sub - Total

=

Tk.

3,328.83

 

Incidental charges

10.00%

=

Tk.

332.88

 

Profit

10.00%

=

Tk.

332.88

 

Overhead

3.50%

=

Tk.

11.65

 

 

Total

=

Tk.

4,006.24

Add VAT with adjustment factor

1.06383

6.00%

=

Tk.

255.72

 

 

Grand Total

=

Tk.

4,261.96

Say,

Tk. 4,262 .00 each

 

 

 

 

 

 

 

 

 

Item No.- 28.5.4

 

 

 

 

 

Supplying different sizes Valve Tee, Service Tee: 50 x 25 mm Service Tee CD 40

 

 

 

 

 

Considering 1 No. Tee

  1. Service Tee (as per Titas Gas rate)

 

 

=

Tk.

3,240.01

  1. Carrying, welding & fitting-fixing

 

LS

=

Tk.

1,280.00

 

 

Sub - Total

=

Tk.

4,520.01

 

Incidental charges

10.00%

=

Tk.

452.00

 

Profit

10.00%

=

Tk.

452.00

 

Overhead

3.50%

=

Tk.

15.82

 

 

Total

=

Tk.

5,439.83

Add VAT with adjustment factor

1.06383

6.00%

=

Tk.

347.22

 

 

Grand Total

=

Tk.

5,787.05

Say,

Tk. 5,787 .00 each

 

 

 

 

 

 

 

 

 

Item No.- 28.6

 

 

 

 

 

Supplying & fitting-fixing in position different dia I/F all complete in all respect as per specification of Titas Gas T & D Co. Ltd.

 

 

 

 

 

Considering 1 No.

(a) 50 mm dia insulation kits 1 no @

Tk. 1,914.93

each

=

Tk.

1,914.93

  1. 50 mm flange W/N 150 R/F 2 nos @
  2. 5/8" x 3" long nut-bolt

with washer 4 nos @

Tk. 786.95

Tk. 74.18

each
each

=

=

Tk. Tk.

1,573.90

296.72

  1. Carrying, welding & fitting-fixing

 

LS

=

Tk.

1,920.00

 

 

Sub - Total

=

Tk.

5,705.55

 

Incidental charges

10.00%

=

Tk.

570.56

 

Profit

10.00%

=

Tk.

570.56

 

Overhead

3.50%

=

Tk.

19.97

 

 

Total

=

Tk.

6,866.64

Add VAT with adjustment factor

1.06383

6.00%

=

Tk.

438.30

 

 

Grand Total

=

Tk.

7,304.94

Say,

Tk. 7,305 .00 each