SL | Items | Rate | Unit |
1591 | 2 ply petroleum asphalt (Chinese) | Tk. 9.00 | per sft |
1592 | Coal | Tk. 7.00 | per kg |
1593 | 2.44 m x 1.22 m size hard board | Tk. 600.00 | per piece |
1594 | PVC water stopper | Tk. 160.00 | per foot |
1595 | Sign board including material, painting,lettering etc all complete | Tk. 225.00 | sft |
1596 | Autocad operator | Tk. 800.00 | per day |
1597 | printing of drawing | Tk. 18.00 | sft |
1598 | As built work survey & report | Tk. 1,800.00 | per day |
1599 | Providing expertised Architect 5years exp with registration in respective professional body | Tk. 70,000.00 | per month |
1600 | Providing expertised engineer 10 years exp with registration in respective professional body | Tk.120,000.00 | per month |
1601 | Providing pick up (double Cabined) | Tk. 70,000.00 | per month |
1602 | photographer | Tk. 1,100.00 | per day |
1603 | photo print , post card sisez | Tk. 7.00 | each |
1604 | Engineer, Expertise in microsoft MS Project /Primavera and experience by min 5yrs | Tk.120,000.00 | permonth |
1605 | Engineer, min graduate in relevant field | Tk. 1,800.00 | per day |
1606 | Diploma Engineer, min 5yrs Exp | Tk. 1,800.00 | per day |
1607 | Diploma Engineer, min 1yrs Exp | Tk. 1,000.00 | per day |
1608 | Royality of Earth | Tk. 1,715.00 | per |
1609 | Royality of Dredge material in the water body | Tk. 800.00 | per |
1610 | Calibration of pressure gauge | Tk. 5,400.00 | per set |
1611 | Calibration of hydrauic jack & pressure gauge combined | Tk. 33,100.00 | per set |
1612 | Arc welding at workshop / factory | Tk. 25.00 | per foot |
1613 | Cutting by oxy-ace of 12 mm M.S plate, top & bott plate | Tk. 36.00 | per foot |
1614 | 12 mm MS Plate Grinding to V bevel top & bott | Tk. 50.00 | per foot |
1615 | 25 mm dia Hole in 12 mm M.S plate | Tk. 50.00 | per nos |